# XZBT implementation status
**Updated:** September 5, 2026
**State:** Phase 0 complete; ready to begin Phase 1 runtime skeleton
**Planning baseline:** `05fe2b4e021ba86e4a290d05b63c7cae0e386128`
**Exact demarcation:** GC1 direct-file feasibility (10/10 checks), GC2 shared format contracts, GC3 resolution semantics, GC4 clock/PRNG semantics, and GC5 ownership/failure semantics are complete at the Phase 0 contract-oracle level. The implementation plan maps GC6 measurements and GC7 completion/library/build checks to later milestones. No production runtime work has begun; real subsystem, Web Audio synchronization, performance, and soak evidence remain assigned to Phases 19.
The user requested sequential implementation with a stop on problems. The [manual version 3 evidence](evidence/phase0/2026-09-04-user-run-v3.md) verifies embedded data-URL worklet loading in direct-file Chrome. The subsequent [user-performed restart test](evidence/phase0/2026-09-04-user-restart.md) restored Blue Study activity 0.37 and master volume 0.19 immediately on reopening. Native tone output and AudioContext suspend/resume are also observed. Ordinary file import, selection of both exhibits, regular Chrome mode, and [directory cancellation/denial fallback](evidence/phase0/2026-09-05-user-directory-fallback.md) have been confirmed.
| Phase | Status | Evidence or next prerequisite |
| --- | --- | --- |
| 0 — Contracts and feasibility | Complete | GC1 passed; GC2GC5 shared contracts and traces passed; GC6/GC7 later gates scheduled and mapped |
| 1 — Runtime skeleton | Ready | Follow the [implementation plan](XZBT_0-1_Implementation_Plan.md) and preserve Phase 0 contract oracles |
| 2 — Common grammar | Not started | Complete Phase 1 and shared contracts |
| 3 — Audio engine | Not started | Earlier phases and audio contracts |
| 4 — Visual engine | Not started | Earlier phases and visual contracts |
| 5 — Events and cadence | Not started | Earlier phases and event/cadence contracts |
| 6 — Scenario director | Not started | Earlier phases and scenario contracts |
| 7 — Dynamic UI | Not started | Earlier phases and UI contracts |
| 8 — Library and persistence hardening | Not started | Earlier phases and library contracts |
| 9 — Reference suite completion/audit | Not started | Earlier phases, challenge coverage, benchmark and soak evidence |
## Work saved
- A self-contained [Phase 0 probe](../prototypes/phase0/XZBT-phase0-probe.html) for import, isolated probe caching, settings restoration, user-initiated audio, embedded engine worklet loading, suspend/resume, and injected storage failure.
- Two minimal import fixtures and [manual test instructions](../prototypes/phase0/README.md).
- Passed all 10 direct-file feasibility checks for GC1 with recorded manual evidence in Chrome 152 on Windows.
- Authoritative JSON Schema ([schema/xzbt-0.1.schema.json](../schema/xzbt-0.1.schema.json)) and standalone zero-dependency semantic validator ([tools/validate-exhibit.mjs](../tools/validate-exhibit.mjs)).
- Automated GC2 conformance test matrix ([test/gc2-runner.test.mjs](../test/gc2-runner.test.mjs)) verifying 12 valid and fault-injected fixtures with zero errors.
- Format Specification Revision 0.3 with exact shared GC3 resolution/binding/transition, GC4 clock/PRNG/audio-alignment, GC5 ownership/failure/dispatch, and GC7 import/update/build contracts.
- Executable Phase 0 contract models and tests for GC3GC5; the combined Phase 0 run passes 27 tests with zero failures.
- A sequenced [implementation plan](XZBT_0-1_Implementation_Plan.md) mapping every MVP completion group, reference challenge, GC6 measurement stage, and GC7 library/build verification stop.
- Preserved user evidence runs for versions 1, 2, 3, offline, file relocation, and directory fallback.
## Phase 1 entry condition
The [injected-storage-failure run and audio follow-up](evidence/phase0/2026-09-04-user-storage-failure.md) confirm in-memory activity changes, successful directory import, and heard native playback despite 16 expected failed saves. The user subsequently confirmed the visible session-only warning. The injected-storage-failure check passed; this does not establish real browser permission-denial behavior.
Worklet loading and the user-performed restart/settings test have passed and need not be repeated without a relevant code change. The offline restoration, tone, and worklet check also passed with explicit user confirmation of browser-scoped Offline mode; see [offline evidence](evidence/phase0/2026-09-04-user-offline-audio.md). The [user confirmed regular Chrome mode and ordinary import/activation](evidence/phase0/2026-09-04-user-import-environment.md). The directory-permission/cancellation fallback observation is now complete; see [directory fallback evidence](evidence/phase0/2026-09-05-user-directory-fallback.md). GC1 is fully satisfied.
The browser rejection explicitly forbids agent workarounds through alternate browser surfaces, raw commands, or indirect execution. No workaround was attempted. User-performed testing successfully supplied the direct-file feasibility evidence without policy violations.
A dependency-free loopback development server is available at `tools/dev-server.mjs`. It serves the workspace at `http://localhost:5173/` for later automated development testing only and listens on both IPv4 and IPv6 loopback. It may support source-level UI or regression work after Phase 0, but direct-file operation remains the primary distribution architecture.
Phase 0 is complete. Begin Phase 1 with the runtime skeleton and reproducible modular-source build described in the implementation plan. Reuse the GC4 PRNG known vectors in the production `SeededRNG`; do not reinterpret the frozen GC3GC5 contracts silently. The mandatory combined-load measurements, production subsystem conformance, two-hour development soak, and eight-hour release soak remain outstanding at their mapped later gates.