Commit Graph
2 Commits
Author SHA1 Message Date
LabyricornandClaude Opus 5 1cde2f9f68 feat(scenario): implement the phase 6 scenario director
Add Format Specification section 21 (Scenario Model 0.1) and the runtime
that realizes it: the scenario director, seven trigger classes, timelines
with repeats and branches, admission and concurrency control, nested
ownership with bounded cleanup, and the production GC5 resource counters.

Exhibit E provides a reproducible forty-minute long-scenario reference and
scenario-challenge.xzbt covers the PRD 131 cases. A standalone
acceptance/soak page is built by tools/build-scenario-acceptance.mjs.

252 automated checks pass. The two-hour real-duration development soak
required by the GC6 schedule remains pending.

Co-Authored-By: Claude Opus 5 <[email protected]>
Claude-Session: https://claude.ai/code/session_01M7dgfQ12mpM4JjSMv3inLA
2026-09-06 22:54:31 +00:00
LabyricornandClaude Opus 5 d5d7091289 feat(visual): add the slice 4g challenge fixtures and reference exhibits
Fourteen visual challenge fixtures and the first visuals for reference exhibits
A through D, all executing without a line of subject-specific renderer code —
which is the claim slice 4g exists to test. A subject the engine needs special
handling for is a subject the format cannot express.

The standalone CLI validator no longer disagrees with the production one. It
had been falling through to ERR_UNSUPPORTED_TARGET for every `visuals.*` binding
target, so legal exhibits — including the committed minimal-visual fixture —
failed the CLI while passing the runtime. The four section 8.1 visual target
families are now recognized in both, and a test runs the CLI validator across
every exhibit and challenge fixture so the two paths cannot drift apart again.

Co-Authored-By: Claude Opus 5 <[email protected]>
Claude-Session: https://claude.ai/code/session_01ShxxFqFmCUDQnQvFNm4TKy
2026-09-06 21:53:38 +00:00