Add the Phase 6 evidence record, update the implementation status,
verification gates, gap-closure decisions, implementation plan and README
for the scenario director, and state plainly that Phase 6 is not accepted
until its two-hour real-duration soak is observed.
Co-Authored-By: Claude Opus 5 <[email protected]>
Claude-Session: https://claude.ai/code/session_01M7dgfQ12mpM4JjSMv3inLA
- Record user evidence for directory fallback to complete GC1 (10/10 checks passed)
- Expand Format Specification 0.1 to Revision 0.2 with normative shared contracts
- Author JSON Schema Draft-07 at schema/xzbt-0.1.schema.json
- Implement zero-dependency semantic validator at tools/validate-exhibit.mjs
- Create 12-case conformance fixture suite and automated test runner (12/12 passing)
- Update implementation status, verification gates, and gap closure decisions
- Add devlog entry covering stall recovery and Phase 0 current state