docs(visual): close the visual contract with the phase 4c automation, lifecycle, camera, effects, and ceiling rules

Format Specification revision 0.7 adds section 19, the third and final
visual contract section, covering PRD 85-89 and 119-120.

Visual automation reuses the audio track shape of 16.1 and adds only
`loop`. It is declared in two scopes: `visuals.automation`, measured from
activation, and `visuals.systems.<id>.automation`, measured from that
system's instantiation boundary, so a track on a spawned system behaves
identically however late the spawn happens.

Section 8.1 gains exactly four visual rows, all system-level: camera
fields, layer opacity, system visibility, and post-effect parameters. No
per-object geometry, transform, or style property becomes externally
addressable in 0.1, so the statements in 17.14 and trace 19 of 18.10
survive unchanged. This is the decision 17.14 and 18.6 both deferred.

Systems are persistent or spawned by an explicit `lifecycle` enum. A
spawned system is a template, instantiated only by a spawn action, with a
five-state machine plus FAILED, a `0ms` default release, and a spawn
ceiling that refuses rather than evicts.

The camera matrix is normative, including that parallax multiplies the
camera translation only. `projection` is authored once and is neither
automatable nor bindable.

Seven post-effects, applied in normative array order with a stated
approximation boundary. `grain` is explicitly exempt from reproducibility
and consumes no procedural stream.

Section 19.5 is the centralized ceiling table PRD 120 requires. It
separates authoring bounds, which reject an exhibit at import, from
runtime ceilings, which shed work by a documented deterministic rule and
keep the exhibit running, and it restates every ceiling first fixed in
sections 10 and 14 through 18. Its aggregate values are provisional
pending the slice 4h GC6 measurement.

Two diagnostic codes added: ERR_INVALID_EFFECT_TYPE and
WARN_VISUAL_CEILING. ERR_AUTOMATION_CONFLICT widens to cover a visual
scope and the behavior collision rather than minting a second code.

Documentation only: no runtime, schema, fixture, or test file was
touched. The visual contract now contains no unresolved forward
reference, and npm test still passes 102 tests with zero failures.

Co-Authored-By: Claude Opus 5 <[email protected]>
Claude-Session: https://claude.ai/code/session_01AzX3848PwqYwzdUCWvjegL
This commit is contained in:
2026-09-06 04:29:40 +00:00
co-authored by Claude Opus 5
parent 2deec016d6
commit d3cd688a3c
4 changed files with 583 additions and 16 deletions
+2 -2
View File
@@ -43,7 +43,7 @@ Phase 4 is the largest milestone in this plan: twenty-one PRD sections (69-89) p
| --- | --- | --- | --- |
| 4a — Contract I | **Complete at Revision 0.5.** Format Specification section 17: pipeline and canonical units, the `visuals` container, layers, scene model and coordinate/fit modes (PRD 70), 2.5D depth (PRD 71), the fourteen geometry primitives (PRD 72), common visual properties (PRD 73), the transform model (PRD 74), appearance and the safe blend set (PRD 75), and paths and splines (PRD 76). Documentation only; no runtime change. | Sections 1-13 | — |
| 4b — Contract II | Format Specification section 18: visual components (PRD 77), particle systems (PRD 78), placement distributions (PRD 79), emitters (PRD 80), repeaters (PRD 81), the behavior vocabulary (PRD 82), procedural fields (PRD 83), and trails, ribbons, and links (PRD 84). Documentation only. **Complete at Revision 0.6.** | 4a | — |
| 4c — Contract III | Format Specification section 19: visual automation and loop modes (PRD 85), visual lifecycle and ownership (PRD 86), camera and projection (PRD 87), post-processing (PRD 88), visual safety limits (PRD 89), the centralized runtime ceilings of PRD 120, and the visual rows added to the section 8.1 target-capability table. Documentation only. | 4a, 4b | — |
| 4c — Contract III | **Complete at Revision 0.7.** Format Specification section 19: visual automation and loop modes (PRD 85), visual lifecycle and ownership (PRD 86), camera and projection (PRD 87), post-processing (PRD 88), visual safety limits (PRD 89), the centralized runtime ceilings of PRD 120, and the four system-level visual rows added to the section 8.1 target-capability table. Documentation only. | 4a, 4b | — |
| 4d — Renderer core | Canvas 2D backend, the scene/coordinate/fit resolution, layers, the transform stack, the fourteen primitives, appearance and paint, paths and splines, and depth sorting. Widest new-code surface in the phase. | 4a | — |
| 4e — Procedural systems | Visual components, particles, distributions, emitters, repeaters, behaviors, fields, trails/ribbons, and distance links. | 4b, 4d | — |
| 4f — Automation, lifecycle, and effects | Visual automation into the shared section 8 resolution path, spawned-system lifecycle and ownership, camera projection, post-effect passes, and enforcement of the centralized ceilings. Touches the Phase 2 and Phase 3c resolution path, so it carries the widest regression surface in Phase 4. | 4c, 4e | — |
@@ -52,7 +52,7 @@ Phase 4 is the largest milestone in this plan: twenty-one PRD sections (69-89) p
Slices 4a through 4g are implementable and verifiable without a display measurement. Slice 4h and the PRD 130 visual acceptance challenge are not: the challenge's judgement is visual, and the benchmark is a hardware measurement, which the recorded test boundary assigns to user-performed runs. Phase 4 is not accepted until 4h and the visual challenge close, regardless of the state of the first seven slices.
The three contract slices land before any of the implementation slices, because the section 17-19 contract fixes decisions that 4d through 4f would otherwise have to relitigate: the resolution boundary for visual ValueSpec fields, the transform composition order, depth semantics, and which visual properties are externally addressable at all. Whether the finished contract also passes a multi-model review before 4d begins — the pass that found thirteen defects in sections 14-16, nine of which any single reviewer would have missed — is an open decision recorded here rather than assumed.
The three contract slices are complete. They landed before any implementation slice because the section 17-19 contract fixes decisions that 4d through 4f would otherwise have to relitigate: the resolution boundary for visual ValueSpec fields, the transform composition order, depth semantics, and which visual properties are externally addressable at all — which section 19.1 settles at exactly four system-level target families and nothing per-object. Whether the finished contract also passes a multi-model review before 4d begins — the pass that found thirteen defects in sections 14-16, nine of which any single reviewer would have missed — is the one open decision, and it is now due rather than pending, because 4d is the next slice.
Phase 3 remains unaccepted while its user-observed gates (traces 15-17 of section 16.11 and the Phase 1 direct-file restart observation) are open. Those gates are pending measurement, not failed, and no Phase 4 slice depends on them; Phase 4 nonetheless carries that debt forward and cannot close it.