generated from Labyricorn/labyricorn-project-template
docs: close Step 6 with reconciled Contract 5.3 evidence
This commit is contained in:
@@ -163,3 +163,6 @@ missing-page or timeout testing.
|
||||
architecture was introduced.
|
||||
|
||||
All Step 6.4 acceptance categories pass. Step 6.5 has not been implemented.
|
||||
*(Adjudication note: Step 6.5 was subsequently adjudicated as satisfied by existing
|
||||
implementation and later evidence at the Step 6.10 completion gate; see the
|
||||
[Step 6.10 closure report](../reference/XZBT-NGN-Step6.10-Closure-Report.md).)*
|
||||
|
||||
Reference in New Issue
Block a user