docs: finalize XZBT-NGN project records

This commit is contained in:
2026-09-17 19:46:30 -07:00
parent 835d966e75
commit 5075394f2a
5 changed files with 64 additions and 610 deletions
+10 -7
View File
@@ -17,8 +17,11 @@ failures and their evidence remain below as historical context, not current gate
Baseline: NGN HEAD `76928f7`, clean at initial inspection. Read the Contract 5.2,
Implementation Plan 5.2, Authoring Guide 5.2, Step 4 report/review, README/AGENTS,
source, fixtures and completion devlog. The owner supplied `docs/implementation_plan.md`
and `docs/walkthrough.md` during the run; these accepted triage/completion notes
were read and preserved. Their permissive metadata interpretation matches this
and `docs/walkthrough.md` during the run (since relocated to
`docs/reference/XZBT-NGN-Step4-Review-Triage.md` and
`docs/reference/XZBT-NGN-Step4-Triage-Walkthrough.md`, which reflect their actual
Step 4 triage content); these accepted triage/completion notes were read and
preserved. Their permissive metadata interpretation matches this
implementation. Their existing fixture copy notice was confirmed present.
The Step 4 UI already accepted same-origin paths without source edits. Its gaps
@@ -191,11 +194,11 @@ were introduced. No SciFi internals were used to infer NGN behavior.
- `STEP5-MVP-COMPLETION-REPORT.md` (new): this report.
The owner's newly supplied `docs/implementation_plan.md` and `docs/walkthrough.md`
remain unmodified. Production host/session implementation, transport and server
were not changed during closure. The earlier follow-up changed only SciFi's
contract adapter externally; closure makes no external source changes. Section R
lists the final fixture, devlog, test, and evidence changes. Nothing was staged,
committed or pushed.
(now under `docs/reference/`) remain unmodified. Production host/session
implementation, transport and server were not changed during closure. The earlier
follow-up changed only SciFi's contract adapter externally; closure makes no
external source changes. Section R lists the final fixture, devlog, test, and
evidence changes. Nothing was staged, committed or pushed.
# M. Known limitations